The ARA is a centre of excellence in delivering aerodynamic capabilities to the aviation sector. Forming part of the BAE Systems FalconWorks business, within the Air sector, ARA benefits from being both big and small, drawing on wider engineering expertise and know-how where needed.
-
1952
1952-1954
Formation of the Aircraft Research Association by the 14 Member Companies with Mr Ron Hills appointed as Chief Executive. Artists impression of ARA and construction photographs c1954.
-
1956
1956
The official opening of the ARA Transonic Wind Tunnel (TWT) by HRH The Duke of Edinburgh and the first wind tunnel test of the Saunders Roe SR-177 model. -
1958
1958
Commissioning of the ARA Supersonic Wind Tunnel (M = 4.0 to 5.0) -
1960
1960
TWT Testing of the TSR2 aircraft (Tactical Strike & Reconnaissance). -
1962
1962
Upgrades to the TWT control and data acquisition systems. -
1963
1963
Opening of the Two Dimensional (2DT) wind tunnel for aerofoil sections. -
1964
1964
ARA workshop for manufacturing wind tunnel models. -
1965
1965
Official opening of the ARA Sports & Social Club facility for staff and their families. -
1966
1966
ARA Hypersonic wind tunnels (M = 6.0, 7.0 & 8.0). -
1970
1970
Transonic and Supersonic testing of Concorde. -
1972
1972
Early Turbine Powered Simulator (TPS) testing on the Galaxy half model in the TWT. -
1974
1974
Upgraded model movement system and novel rig developments, showing Tornado on cranked sting arrangements. -
1975
1975
ARA Computational Fluid Dynamics (CFD) group formed. -
1976
1976
ARA Captive Trajectory Rig (CTR) or Two Sting Rig (TSR) developed, showing Harrier model with store release. -
1977
1977
Harrier and Concorde models being prepared for test in the TWT. -
1980
1980
Tornado with multiple balanced stores being tested in the TWT. -
1981
1981
Airbus A300 family testing begins at ARA. -
1983
1983
EFA (European Fighter Aircraft – later Eurofighter Typhoon), testing on the ARA Two Sting Rig (TSR). -
1988
1988
New honeycomb flow straightener installed in the TWT. -
1989
1989
Acoustic testing of a large scale contra-rotating propeller in the TWT. -
1990
1990
BAE146 half model with through flow nacelles testing in the TWT. -
1992
1992
Airbus A320 cryogenic model designed and manufactured at ARA for the European Transonic Wind Tunnel (ETW). -
1994
1994
Lockheed Martin Joint Strike Fighter (JSF) contender (later designated F-35), in the ARA TWT. -
1995
1995
Boeing Joint Strike Fighter contender in the ARA TWT. -
1997
1997
McDonnell Douglas Joint Strike Fighter contender testing using pressure-sensitive paint in the ARA TWT. -
1998
1998
Airbus A340-600 testing in the ARA TWT. -
1999
1999
New Sulzer compressor installed for the ARA TWT. -
2000
2000
Nimrod 2000 maritime patrol aircraft testing in the ARA TWT. -
2001
2001
Completion of the ARA noise enclosure to allow 24hr operation of the ARA TWT. -
2002
2002
ARA’s 50th anniversary celebrations, featuring HRH The Duke of Edinburgh presenting a commemorative plaque to Mr Ron Hills, ARA’s 1st Chief Executive. -
2004
2004
Airbus A380 testing in the ARA TWT. -
2007
2007
Hybrid Laminar Flow research model (HLFC) testing in the ARA TWT. -
2008
2008
Bombardier C-series testing in the ARA TWT. -
2009
2009
SAAB Gripen with pressure-sensitive paint testing in the ARA TWT. -
2012
2012
ARA’s 60th anniversary celebrations. -
2013
2013
Captive trajectory tests with Unmanned Aerial Vehicle (UAV) in the ARA TWT. -
2014
2014
Mantis UAV test in the ARA TWT. -
2015
2015
Particle Image Velocimetry (PIV) tests of a cavity research model. -
2017
2017
Gust generation rig testing in the ARA TWT. -
2018
2018
Upgraded acoustic liner and microphone arrays with large scale propeller in the ARA TWT. -
2020
2020
IR Thermal image of transition research model in the ARA TWT. -
2021
2021
ARA TRUFLOW CFD result with 3D visualisation and TRUFLOW thrust reverser research model designed and manufactured at ARA with UV oilflow testing in the RUAG low speed wind tunnel. -
2022
2022
CleanSky research programme SUBLIME, PIV tests in the ARA TWT and the Dual Stream Jet Propulsion Rig (DSJPR) developed under the AVAUNT and ODIN projects. -
2023
2023
Large scale nacelle research in the ARA TWT with CFD solution overlaid. 2023 ARA becomes part of BAE Systems Falconworks®. HRH The Princess Royal visits ARA. -
2024
2024
The ARA High Speed Reference Model (HSRM) designed, manufactures and tested. -
2025
2025
Upgrade to the propulsion test facilities completed.