Model moving from Model Bays into TWT Test Section

Model Moving from Model Bays into TWT test section

The animation shows the transfer of a model from the assembly cart to the wind tunnel working section:

  1. The transfer of an assembled model onto a full model cart
  2. The moveable section being rolled back to allow access to the Transonic Wind Tunnel (TWT) test section
  3. The model cart being moved from secure model bays into the Transonic Wind Tunnel (TWT) test section
  4. Installation of the model into the Transonic Wind Tunnel
  5. Closure of the moveable section to complete the tunnel circuit 

ARA Sitemap