1952 ARA Formed and Ron Hills Appointed as Chief Executive
1956 HRH The Duke of Edinburgh officially opens ARA
1957 First Transonic Wind Tunnel test for industry
1958 Supersonic Tunnel
1965 Mach 4 – 5 Tunnel
1966 2-D Tunnel
1968 Mach 7 Tunnel
1970 First test with TPS powered model
1978 MST nacelle and TPS calibration facility
1978 Captive Trajectory Rig
1987 Large scale propeller tests in TWT
1988 TWT Acoustic Liner
1990 TWT Honeycomb flow smoother
1991 Enhanced Twin Sting Rig for TWT
1991 Large Scale Thrust Measuring Rig
1993 First Cryogenic model manufactured at ARA (ETW reference model)
1998 Anti-surge controller for TWT Supersonic Circuit
2000 TWT Noise enclosure – Phase I- 24hr operation for TWT
2000 Brown Boveri compressor replaced with Sulzer axial flow compressor
2002 50th Anniversary Celebrations with HRH The Duke of Edinburgh
2003 TWT Noise enclosure – Phase II
2008 1st Production Pressure Sensitive Paint test in the TWT
2010 Phase 1 of TWT Upgrade Plan